CONTRACT:
Marlborough College, Marlborough – Grade II Listed Building
EQUIPMENT:
Tube & Fittings + Alu Beams + UBIX Roof System
DESIGN BRIEF:
TEMPORARY ROOF: Designed and erected in three phases. To provide drawings and calculations for a temporary roof to weather protect the building, allowing the roof to be replaced.
ACCESS: To provide drawings and calculations for a partly sheeted / partly netted, general purpose access scaffold with a bridged area to one end. Nom. 2.0m bays and 2.0m lifts. Loaded to 2.0kN/m² using tube and fittings with aluminium beams.
![Request A Quote CTA - Long](https://no-cache.hubspot.com/cta/default/4895389/99608e8b-39fe-4978-bdee-8aa1bab4a1ca.png)
![Designs for the Marlborough College project.](https://www.designsafe.co.uk/wp-content/uploads/2018/06/marlboroughdraw1-300x212.jpg)
![Designs for the Marlborough College project.](https://www.designsafe.co.uk/wp-content/uploads/2018/06/marlboroughdraw2-300x211.jpg)
![Scaffolding on the Marlborough College.](https://www.designsafe.co.uk/wp-content/uploads/2018/06/marlboroughpic1-300x214.jpg)
![The Marlborough College front the front.](https://www.designsafe.co.uk/wp-content/uploads/2018/06/marlboroughpic2-300x225.jpg)