CONTRACT:
Villiers House, Royal Leamington Spa
EQUIPMENT:
Tube & Fittings + Alu Beams + Netting
DESIGN BRIEF:
ACCESS: To provide drawings and calculations for a netted access scaffold to the front, side and rear elevations of Villiers House with a full length loading gantry to the front. Cantilevered section at corner over pavement. Nom. 2.0m bays and 2.0m lifts. Loaded to 2.00kN/m² using tube and fittings with aluminium beams.
LOADING BAYS: To provide drawings and calculations for a 15.0m long loading gantry to the front, loaded to 10.0kN/m². And a 4.9m * 3.1m loading bay to the rear, loaded to 5.0kN/m²